Infrastructure
Technical Information
SPs - supply places
On our spacious campsite there are four SPs providing
Electrical connections
230V- and 400V-connections
Depending on your location on the site, easily about 100m of electric lines can be necessary.
Telephone connection
The clearing of a telephone connection will surely only be necessary in exceptional case due to the predominant usage of mobile phones.
Water connection
Mobile phone network
On the camping site the signal strength of the D2-Net is good, of the D1-Net it is partly and with lower signal strength available. The E-Net can only be used limitedly.